Kyiv, Denys Monastyrskyi St., 3A +380 (50) 010-15-67
The full scope of work
on the renovation of two-level
flats in Kyiv
Fill in the form and get a 10% discount on all our services

Calculate cost of works.

Calculate the cost work on yours parameters and get 10% discount on all ours services
Step 01/04
Object Parameters
Proceed to wall status
Step 02/04
Wall Condition
Bare Walls
Require full plastering works
Plastered Walls
Plastering works done by the developer
Proceed to area selection
Go back
Step 03/04
Area
20 m²
Proceed to design
Go back
Ceiling
Walls
Flooring
Go back
View Results

Result.

Total Area
Cost of work with materials
We will contact you and answer all additional questions
Turnkey renovation:
What's included.
Basic Package
What's included: 100% of all work at the quoted repair prices
Price: from $450 / m²
Title of the workUnit of measurementPrice, $
Dismantling, installation works, rough electrical45
Plastering works40
Rough plumbing30
Floor screed25
Painting and drywall works35
Tiling works30
Laminate flooring installation35
Wallpaper35
Stretch ceiling30
Standard doors45
Finishing plumbing60
Finishing electrical40
Medium Package
What's included: 100% of all work at the quoted repair prices
Price: from $450 / m²
Title of the workUnit of measurementPrice, $
Dismantling, installation works, rough electrical70
Plastering works55
Rough plumbing45
Floor screed35
Painting and drywall works55
Tiling works35
Underfloor heating20
Wall painting or paintable wallpaper65
Quartz vinyl60
Stretch ceiling45
Standard or concealed doors60
Finishing plumbing60
Finishing electrical45
Premium Package
What's included: 100% of all work at the quoted repair prices
Price: from $900 per m²
Title of the workUnit of measurementPrice, $
Dismantling, installation works, rough electricalм295
Plastering worksм260
Rough plumbingм255
Floor screedм240
Painting and drywall worksм270
Tiling worksм250
Underfloor heatingм225
Supply and exhaust ventilation systemм265
Decorative plaster or microcementм290
Parquet flooringм295
Drywall or plastered ceilingм275
Concealed doorsм265
Finishing plumbingм265
Finishing electricalм250
Why we ?
Professionally
and safely
We employ only trusted professionals and offer a warranty period of up to 60 months.
All stages
Taking the client's needs into account from planning to execution.
Exciting
bonuses
We offer a 10% discount on all services when you order a complete package of works.
Trusted
materials
Optimal selection of the finest materials.
What are the stages of the work?

A comprehensive approach allows you to think through solutions for your home 2 steps ahead. Design+renovation+furniture is very convenient for the customer, and it is much easier for us to ensure quality at all stages of work.

01
First call

Getting to know the client.
We study the customer's goals, his
vision of the task and all his wishes.

02
Meeting and consultation

Visit to the site. The specialist conducts an inspection and provides his/her vision.

03
Conclusion of the contract

Decision-making.
Official confirmation of the start of cooperation

04
Розробка дизайн- проєкту і реалізація

Designer's visit, preparation of drawings and sketches. Implementation of solutions

05
Facility handover

Obtaining a result.
Completion of cooperation

Client's reviews.
Residential complex "New England", Kyiv

Customer's feedback on repairs in the residential complex "New England"

Residential complex "Varshavsky", Kyiv

Modern renovation in the residential complex "Varshavsky"

Residential complex "Faina Town", Kyiv

Complete turnkey renovation in the Faina Town residential complex

We always strive to achieve the highest level of excellence in our projects. Our system works efficiently to ensure quality execution at every stage of the process.
Our team.
Денис, засновник Halfee
Founder of Halfee
Denis
Олена, керівник відділу дизайну
Head of the Design Department
Olena
Вероніка, керівник відділу постачання
Head of the Procurement Department"
Veronika
Олена, керівник меблевого напрямку
Head of Furniture Direction
Olena
Дмитро керівник меблевого виробництва Halfee
Head of Furniture Production
Dmytro
Operational manager
Anastasiia
Андрій, менеджер проєктів
Projects manager
Andrii
Марина, Менеджер меблевих проєктів
Furniture project manager
Maryna
Purchasing department manager
Yurii
Сергій, менеджер проєктів
Projects manager
Serhii
Анна, фінансист
Finances manager
Anna
Олена, світло дизайнер
Lighting Designer
Olena
Designer
Yulia
Marketing
Victor
Targeter
Taras
Question:
Answer: .
What is the main feature of renovating a two-level flat?
A split-level flat is not just a large space, but a complex engineering project. The main differences lie in the design and installation of the staircase, a more complex heating and air-conditioning system (due to air circulation between floors), and the routing of services for bathrooms, which are often situated one above the other. This requires the involvement of specialist professionals and a precise engineering design.
At what stage of the renovation are the staircases between floors installed?
The installation of the staircase is divided into two stages to avoid damaging expensive materials during the construction work. Firstly, during the structural work stage, a metal frame is welded or a monolithic concrete base is cast (these are used as access stairs for the builders). The finishing work on the staircase (wood panelling, installation of glass balustrades, lighting) is carried out at the final stage, alongside the installation of the final floor covering and doors.
Is additional sound insulation required between floors?
Yes, we strongly recommend soundproofing the floor between storeys. This solves two problems at once: it dampens impact noise (footsteps on the second floor won’t disturb those relaxing in the living room below) and insulates against airborne noise (the sound of the television or conversation from the first floor won’t disturb sleep in the bedrooms on the second floor).
How long does it take to renovate a two-level flat?
Given the large floor area, complex utility networks, and the design and installation of staircases, a turnkey refurbishment of a two-level flat takes on average between 6 and 10 months. A precise work schedule is drawn up once the design project has been approved and is set out in the contract.
Calculate a cost ?
Fill out the form now and receive
a 10% discount on all our services.

    Turnkey renovation of a two-level flat in Kyiv – key points

    Two-story urban living is always associated with spaciousness, privacy, and the ability to clearly separate day and night zones. However, designing and executing such an interior requires a specialized approach, as the presence of stairs, high ceilings, and complex utility hubs presents additional engineering challenges. When you aim to transform non-standard square footage into a harmonious and safe home, it is essential to entrust the work to professionals. Halfee provides a full cycle of services, combining bespoke design, top-tier construction execution, and in-house custom furniture manufacturing.

    Zoning Features and Structural Nuances of Duplex Apartments

    Creating a cozy space across two levels differs significantly from working with standard single-level properties. The primary goal is to establish a logical connection between floors and ensure the proper distribution of functional zones. High-quality duplex apartment renovation typically places the hallway, kitchen, living room, and dining area on the first level, while the second floor is reserved for private bedrooms, children’s rooms, a home office, and walk-in closets.

    To ensure a seamless renovation process, we follow a clear sequence of steps:

    • An initial on-site visit by Halfee’s founder for a detailed inspection, measurements, and discussing the client’s vision.
    • Creation of detailed 3D visualizations and technical drawings that account for all engineering and structural elements.
    • Budget approval, material selection with exclusive partner discounts, and signing the official contract.
    • Rough construction work, wall leveling, installation or reconstruction of interfloor stairs, and utility rough-ins.
    • Fine surface finishing, plumbing fixture installation, lighting setup, and assembly of custom furniture.

    When carrying out two-level apartment renovation, key attention is paid to staircase safety and ergonomics, as well as the accurate calculation of ventilation and heating systems, since warm air naturally rises.

    Budgeting and Renovation Types for Duplex Properties

    The total investment depends on the initial condition of the premises, the complexity of the chosen design solutions, and the quality of finishing materials. Many owners are primarily interested in the final cost of duplex apartment renovation, which is calculated individually after approving the detailed technical project.

    Depending on your goals, you can choose one of the available renovation formats:

    1. Partial transformation and cosmetic refresh. Includes floor replacement, wall painting, or wallpaper replacement without layout changes. This approach is ideal for quickly refreshing the interior with minimal expenses.
    2. Extensive technical modernization. Involves full demolition, rewiring, replumbing, floor screed, and soundproofing. Opting for a major duplex apartment overhaul ensures the reliability of all engineering systems for years to come.
    3. Turnkey comprehensive renovation. The most convenient option, where our team oversees the entire process from the first blueprint to full furniture furnishing.

    If you are planning a 2-level apartment renovation, it is crucial to account in advance for logistics, lifting oversized materials to upper floors, and assembling tall structures. Halfee handles all these tasks, saving your time and budget.

    Specifics of New Developments vs. Secondary Market Properties

    The scope of construction work varies significantly depending on the building type. For instance, when ordering duplex apartment renovation in a new building, owners often receive open-plan layouts with high ceilings, allowing for any architectural solutions. However, it is vital to consider potential building settling and use elastic construction compounds.

    A completely different approach is required for secondary market 2-level apartment renovation, where reinforcing floor slabs, replacing outdated plumbing systems, and leveling complex geometric surfaces are often necessary.

    Before starting the work, it is important to define key priorities:

    • Selecting a reliable staircase structure (metal frame, concrete, or wood).
    • Setting up efficient dual-zone climate control for each floor independently.
    • Designing multiple lighting scenarios for double-height zones and high-ceiling spaces.
    • Designing functional storage systems under the stairs and inside architectural niches.

    When choosing duplex apartment renovation in Kyiv, clients appreciate the ability to entrust complex capital construction tasks to a single accountable team. Moreover, the estimated 2-level apartment renovation cost is calculated prior to starting the work, eliminating any unexpected surprises along the way.

    Benefits of Choosing Halfee and an Integrated Approach

    When duplex apartment design and renovation are handled by a single company, you get a seamlessly coordinated result where every built-out detail precisely matches the original blueprints. Partnering with Halfee professionals guarantees zero miscommunication between builders, engineers, and furniture craftsmen.

    By ordering comprehensive two-story apartment renovation, you completely free yourself from material sourcing hassles, supervising contractors, and managing post-construction waste cleanup.

    Why clients choose Halfee:

    • The company founder personally conducts the initial on-site meeting to delve into project specifics.
    • Over 200 in-house experienced specialists ensure expert execution of projects of any complexity.
    • In-house custom furniture production enables bespoke cabinetry tailored to the exact multi-level layout.
    • An official 5-year warranty is provided on all completed renovation and finishing works.

    For many homeowners, the primary question remains how much a duplex apartment renovation costs in the end. The final budget depends on the selected service package; however, the price fixed in the contract remains unchanged throughout the entire collaboration.

    When ordering turnkey duplex apartment renovation, you receive a special 10% discount on all company services. If you seek a premium result and want to realize turnkey duplex apartment renovation in Kyiv, the Halfee team will bring your dream two-story home to life at the highest standard. Professional space transformation creates a cozy, safe environment where every floor is thoughtfully planned down to the smallest detail. By entrusting your two-story apartment renovation to our specialists, you gain comfort, structural reliability, and impeccable style.

    Show more