Kyiv, Denys Monastyrskyi St., 3A +380 (50) 010-15-67 +380 (73) 011-77-01
Full cycle of works
repairs (secondary)
apartments in Kyiv
Fill in the form and get a 10% discount on all our services

Calculate cost of works.

Calculate the cost work on yours parameters and get 10% discount on all ours services
Step 01/04
Object Parameters
Proceed to wall status
Step 02/04
Wall Condition
Bare Walls
Require full plastering works
Plastered Walls
Plastering works done by the developer
Proceed to area selection
Go back
Step 03/04
Area
20 m²
Proceed to design
Go back
Ceiling
Walls
Flooring
Go back
View Results

Result.

Total Area
Cost of work with materials
We will contact you and answer all additional questions
Turnkey renovation:
What's included.
Basic Package
What's included: 100% of all work at the quoted repair prices
Price: from $450 / m²
Title of the work Unit of measurement Price, $
Dismantling, installation works, rough electrical 45
Plastering works 40
Rough plumbing 30
Floor screed 25
Painting and drywall works 35
Tiling works 30
Laminate flooring installation 35
Wallpaper 35
Stretch ceiling 30
Standard doors 45
Finishing plumbing 60
Finishing electrical 40
Medium Package
What's included: 100% of all work at the quoted repair prices
Price: from $650 / m²
Title of the work Unit of measurement Price, $
Dismantling, installation works, rough electrical 70
Plastering works 55
Rough plumbing 45
Floor screed 35
Painting and drywall works 55
Tiling works 35
Underfloor heating 20
Wall painting or paintable wallpaper 65
Quartz vinyl 60
Stretch ceiling 45
Standard or concealed doors 60
Finishing plumbing 60
Finishing electrical 45
Premium Package
What's included: 100% of all work at the quoted repair prices
Price: from $900 per m²
Title of the work Unit of measurement Price, $
Dismantling, installation works, rough electrical м2 95
Plastering works м2 60
Rough plumbing м2 55
Floor screed м2 40
Painting and drywall works м2 70
Tiling works м2 50
Underfloor heating м2 25
Supply and exhaust ventilation system м2 65
Decorative plaster or microcement м2 90
Parquet flooring м2 95
Drywall or plastered ceiling м2 75
Concealed doors м2 65
Finishing plumbing м2 65
Finishing electrical м2 50
Why we ?
Professionally
and safely
We employ only trusted professionals and offer a warranty period of up to 60 months.
All stages
Taking the client's needs into account from planning to execution.
Exciting
bonuses
We offer a 10% discount on all services when you order a complete package of works.
Trusted
materials
Optimal selection of the finest materials.
What are the stages of the work?

A comprehensive approach allows you to think through solutions for your home 2 steps ahead. Design+renovation+furniture is very convenient for the customer, and it is much easier for us to ensure quality at all stages of work.

01
First call

Getting to know the client.
We study the customer's goals, his
vision of the task and all his wishes.

02
Meeting and consultation

Visit to the site. The specialist conducts an inspection and provides his/her vision.

03
Conclusion of the contract

Decision-making.
Official confirmation of the start of cooperation

04
Розробка дизайн- проєкту і реалізація

Designer's visit, preparation of drawings and sketches. Implementation of solutions

05
Facility handover

Obtaining a result.
Completion of cooperation

Client's reviews.
Residential complex "New England", Kyiv

Customer's feedback on repairs in the residential complex "New England"

Residential complex "Varshavsky", Kyiv

Modern renovation in the residential complex "Varshavsky"

Residential complex "Faina Town", Kyiv

Complete turnkey renovation in the Faina Town residential complex

We always strive to achieve the highest level of excellence in our projects. Our system works efficiently to ensure quality execution at every stage of the process.
Our team.
Денис, засновник Halfee
Founder of Halfee
Denis
Олена, керівник відділу дизайну
Head of the Design Department
Olena
Вероніка, керівник відділу постачання
Head of the Procurement Department"
Veronika
Олена, керівник меблевого напрямку
Head of Furniture Direction
Olena
Дмитро керівник меблевого виробництва Halfee
Head of Furniture Production
Dmytro
Operational manager
Anastasiia
Андрій, менеджер проєктів
Projects manager
Andrii
Марина, Менеджер меблевих проєктів
Furniture project manager
Maryna
Purchasing department manager
Yurii
Сергій, менеджер проєктів
Projects manager
Serhii
Анна, фінансист
Finances manager
Anna
Олена, світло дизайнер
Lighting Designer
Olena
Designer
Yulia
Marketing
Victor
Targeter
Taras
Question:
Answer: .
Where does renovation in a second-hand home begin?
The first and most important stage is a complete dismantling and inspection. We remove old layers of plaster, dismantle the old floor (logs, parquet, linoleum), clean the ceiling. Only after the walls are completely exposed can the foreman accurately assess the condition of the ceilings, the real differences in the surfaces and adjust the final work plan.
Is it possible to redevelop an apartment (secondary) during renovation?
It is possible, but only if these walls are interior partitions (made of brick, plaster or wood). Demolishing or making openings in load-bearing walls is strictly prohibited, as this threatens the strength of the entire building. Our architect-designer will study the apartment plan, determine the type of walls and offer safe and legal redevelopment options.
What are the risks when renovating an apartment on the secondary market?
Old houses can surprise. If mold is found under old wallpaper, we clean it, treat it with special certified antiseptics, and eliminate the cause of dampness. If defects in supporting structures or emergency communications are detected, we urgently stop work on this area, draw up a defect report, and together we look for the optimal technical solution.
Why is renovation in a second-hand apartment usually more expensive than in a new building?
The difference in price is due to three factors that are not available in new buildings: Large-scale dismantling: removal and packaging of tons of outdated materials. Garbage removal and disposal: the volume of construction waste in the secondary market is 2–3 times larger, which requires ordering several trucks. Leveling: the geometry of old rooms often requires more materials for leveling the floor and walls. However, when ordering a comprehensive renovation from us, you receive a transparent estimate, where each square meter is clearly spelled out.
Calculate a cost ?
Fill out the form now and receive
a 10% discount on all our services.

    Turnkey renovation of secondary housing in Kyiv - features, advantages

    Renovating housing stock that already has its own history requires special attention to technical details from both owners and contractors. Aging engineering systems, the specific layouts of past decades, and structural wear and tear present complex challenges during property transformation. Seeking a comfortable and safe environment, investors try to avoid chaotic actions and hiring random workers. Our professional Halfee team offers a comprehensive approach to solving such tasks, combining design, complete engineering reconstruction, and custom cabinet furniture manufacturing into a single framework.

    Technological Stages of Dismantling and Replacing Utilities

    Implementing architectural solutions in mature buildings differs significantly from processes in new constructions due to the need to completely remove remnants of past layers. To avoid risks and inconsistencies between separate crews, owners prefer to choose comprehensive renovation of secondary market properties, entrusting technical supervision and logistics to a single reliable general contractor. This ensures strict compliance with technological regulations and high execution speed.

    At the first stage, craftsmen perform a complete cleanup of surfaces from old plaster, wallpaper, and worn-out flooring. By ordering a coordinated turnkey apartment renovation, the client completely frees themselves from the hassle of removing tons of construction debris. Only after the structures are fully exposed does the installation of new engineering lines begin, using eco-friendly and durable materials.

    The main construction stages in old housing stock include:

    1. Dismantling obsolete finishes, plumbing fixtures, and interior partition walls.
    2. Installing new electrical networks with a high level of overload protection.
    3. Mounting modern pipelines for heating, water supply, and concealed drainage systems.
    4. Plastering walls along screed guides and installing lightweight or classic floor screed.

    If you aspire to completely renew a space in an old city center, the best choice is an apartment renovation from our professional studio. Our specialists account for the settling characteristics of different building types, using special reinforcing materials to prevent microcracks on the finish coat. The company takes full responsibility for supplying the property, including the procurement, delivery, and lifting of rough construction mixes to any floor.

    Economic Aspects and Features of Renovation Budgeting

    The financial side of transforming pre-owned real estate requires a detailed calculation, taking into account the specifics of dismantling and leveling processes. The final estimate is formed based on the room area, the complexity of engineering systems, and the chosen class of final finishing. By choosing an experienced company that performs pre-owned property renovation in Kyiv, the client protects their budget from sudden overpayments, since the amounts fixed in the contract remain unchanged.

    To optimize investments, clients are offered transparent package solutions. If you want to get ergonomic housing without involving third-party subcontractors, the optimal choice is a pre-owned property renovation based on a custom project that combines design, construction, and furnishing. Halfee Studio provides an additional 10% discount on construction processes for comprehensive orders, helping clients save without compromising on reliability.

    When preparing for the start of renovation, it is useful to guide yourself by the key components of the budget:

    Component Part What is Included in the Work Specification Impact Features on Investments
    Design block Design project, utility network diagrams, 3D models Fixed amount per square meter of area
    Construction stage Dismantling, rough finishing, final works Depends on the initial condition of walls and ceilings
    Furniture production Kitchens, walk-in closets, wall panels Determined by the selected class and hardware

    When the need arises to radically redo an old interior, the best choice becomes a turnkey pre-owned home renovation based on a signature design project. This allows the client to receive step-by-step reporting in photo and video formats, monitoring costs and the quality of hidden processes in real time from anywhere in the world.

    Often, the primary financial benchmark for an investor is the average cost of pre-owned home renovation, taking into account the volume of preparatory work. Our studio ensures complete transparency: the client receives a detailed specification where every technological operation is accounted for, which eliminates the appearance of unforeseen expenses.

    Comparing market offers, owners study current prices for secondary market renovation in Kyiv to choose the most favorable and reliable conditions. We offer a reasonable cost for services and provide clients with discounts from direct suppliers of building materials with whom we have cooperated for many years.

    Wishing to start a global modernization, the first step is the decision to order pre-owned property renovation from a trusted company. This allows avoiding discrepancies between the architect’s ideas and the technical capabilities of the construction site, since all departments work according to uniform internal quality standards.

    Furnishing and Final Styling of the Refurbished Interior

    Creating a cozy atmosphere in apartments of old housing stock is impossible without using furniture developed to individual measurements. Standard factory wardrobes or kitchen sets are rarely able to perfectly fit into the architectural niches of such rooms, leaving unaesthetic gaps and voids. Having our own furniture production is the main advantage of our company, allowing us to create storage systems and furniture groups that harmoniously complement the chosen concept.

    Depending on the initial technical condition of the premises and the client’s wishes, different approaches to space renewal are applied:

    • Major renovation of pre-owned housing: full replacement of utility networks, demolition of old partitions, pouring of new floor screed.
    • Cosmetic renovation of pre-owned housing: refreshing final finishes of walls and floors, replacing sockets and lighting fixtures without global layout changes.
    • Premium renovation of pre-owned housing: creating a unique custom interior using natural stone, premium automation systems, and exclusive cabinet furniture.

    The modern design and renovation studio Halfee successfully implements projects in various stylistic directions: from modern minimalism to sophisticated neoclassicism. Furniture designers develop structures for the individual characteristics of the property, which guarantees a perfect fit without gaps. At the final stage, the team carries out the installation of all elements and the connection of household appliances. Owners only have to turn the key in the lock, bring in their personal belongings, and enjoy the flawless quality of their new home, created by the professionals of our studio.

    Show more